Welcome~Jizhou Yaoyu Water Conservancy Machinery Factory
Language: 中文版
Your location: Home >>News

News

How to adjust the screw fastener of the cast iron gate?

Adjust the cast iron gate of the equipment before the equipment. It is necessary to check the external dimensions of the gate and whether the holes reserved for placement at the bottom of the cement structure poured in the second phase match. The circumference of the placement holes at the bottom of the foundation must be relatively larger than the gate, and a circumference of two centimeters is preferred. Cast iron gate is a type of gate that slides through the gate frame slide under the lifting action of a crane, allowing it to fully or partially close and open the water hole. Under the pressure of the water column, the gate is forced to move downstream, closely against the water stop surface of the gate frame. The water stop effect is good, achieving the purpose of controlling the water level and regulating the flow rate!

The vertical plane sliding mainly consists of components such as the suspension seat of the gate frame and the locking diagonal iron. In order to overcome the defect of easy rusting of steel doors in the past, the gate frame and gate plate are all made of cast iron. Among them, the gate frame is composed of an upper crossbeam, a lower crossbeam, a left straight beam, and a right straight beam. In order to facilitate the production and transportation of equipment, the gate plate is generally assembled from several parts up and down according to its size or height.

Before using the equipment, the first thing to check is whether the connecting screws between the vertical and horizontal frames, as well as between the gate plates (referring to the combination of multiple gate plates), have become loose during transportation and loading and unloading. Whether their joints are misaligned or not, they should form a plane and check the gap between the gate and the gate slot. The gap between the gate slot and the gate should not exceed 0mm. If there is a gap, the closing equipment can be adjusted and the connecting bolts can be tightened. When pouring concrete for gate equipment, the mortar flowing into the inclined iron baffle of the gate frame should be thoroughly removed to avoid affecting the opening and closing of the gate after the mortar solidifies. When installing the equipment, the gate should be vertically inserted into the reserved groove, and padding should be placed under the two end frames (it is prohibited to pad the lower crossbeam). The two frames should be stably erected using a manual hoist and diagonal pull. Straighten and level the gate, string anchor bolts in each foot hole, adjust the position of the gate, and support the template for the second phase of pouring.

Navigation

Contact

Contacter:Mr zhang

Mobile:+8618232921188

Tel:+86 18732827880

E-mail:1067691953@qq.com

Add:Gaotian Industrial Zone, Jizhou District, Hengshui City, Hebei Province,China